A54SX16-2TQG176I vs A54SX16-1TQG176 Comparison
Detailed side-by-side comparison of A54SX16-2TQG176I by Microchip Technology and A54SX16-1TQG176 by Microchip Technology. Compare key specifications, electrical parameters, packaging, lifecycle status, pricing, and availability to determine the best component for your design requirements.
Microchip Technology
A54SX16-2TQG176I - 16K Gate FPGA TQFP-176 | Microchip
A54SX16-2TQG176I ✓ ActiveMicrochip Technology
A54SX16-1TQG176 - SX FPGA 24K Gates 147 I/O TQFP-176 | Microchip
A54SX16-1TQG176 ✓ ActiveSpecification Comparison
| Parameter | A54SX16-2TQG176I | A54SX16-1TQG176 |
|---|---|---|
| Brand | Microchip Technology | Microchip Technology |
| Category | FPGA & CPLD | FPGA & CPLD |
| Lifecycle Status | Active | Active |
| Stock Status | In Stock | In Stock |
| Unit Price (USD) | $20.80 | $0.00 |
| Series | SX Family (A54SX16) | SX |
| System Gates | 16000 gates | — |
| Logic Cells | 924 cells | — |
| CLBs | 1452 | — |
| Maximum Toggle Frequency | 320 MHz | — |
| User I/O | 147 | — |
| Process Technology | 0.35 um CMOS | — |
| Supply Voltage | 3V to 3.6V, 4.75V to 5.25V (3.3V/5V) | — |
| Programmability | Antifuse, one-time programmable | — |
| Speed Grade | -2 | -1 |
| Package | TQFP-176 (TQG176), 24x24 mm | — |
| Package Height | 1.4 mm | — |
| Mounting Type | Surface Mount | Surface Mount |
| Operating Temperature | -40C to +85C (industrial) | 0C to +70C (TA) |
| RoHS Status | Compliant, lead free | ROHS3 Compliant |
| Architecture | Sea-of-modules | — |
| Manufacturer Brand Origin | Microsemi / Microchip Technology | — |
| Number of System Gates | — | 24000 |
| Number of I/O | — | 147 |
| Supply Voltage (Core) | — | 3 V to 3.6 V |
| Supply Voltage (I/O) | — | 4.75 V to 5.25 V |
| Operating Supply Voltage | — | 3.3 V, 5 V |
| Package / Case | — | 176-LQFP |
| Supplier Device Package | — | 176-TQFP (24x24 mm) |
| Packaging | — | Tray |
| Programmability Type | — | Antifuse (one-time programmable) |
| Lead Free | — | Yes |
| Product Status | — | Active |
| Manufacturer Lead Time | — | 10 weeks |