USB2512AI-AEZG vs USB2512-AEZG Ikinahambing

Detalyadong pagkakahiwalay na pagkakahambing ng USB2512AI-AEZG sa pamamagitan ng Microchip Technology at USB2512-AEZG sa pamamagitan ng Microchip Technology. Ikinahambing ang mga pangunahing paglalarawan, mga tama ng elektriko, paakay, kalagayan ng buhay, presyo, at pagkakaroon upang makita ang pinakamahusay na komponente para sa iyong mga kinakailangang pang disenyo.

Microchip Technology
USB2512AI-AEZG USB2512AI-AEZG - 2-Port USB 2.0 Hub Controller | Microchip

USB2512AI-AEZG - 2-Port USB 2.0 Hub Controller | Microchip

USB2512AI-AEZG ✓ Nakahanda
Microchip Technology
USB2512-AEZG USB2512-AEZG - USB 2.0 2-Port Hub Controller | Microchip

USB2512-AEZG - USB 2.0 2-Port Hub Controller | Microchip

USB2512-AEZG ✓ Nakahanda

Pagsanggunian na paghahambing

Parametro USB2512AI-AEZG USB2512-AEZG
Brand Microchip Technology Microchip Technology
Kategorya Interface ICs Interface ICs
Katayuan ng Lifecycle Aktibo Aktibo
Product Type USB 2.0 Hi-Speed hub controller USB 2.0 high-speed 2-port hub controller
Number of Downstream Ports 2 ports 2 ports
Upstream Port 1 USB 2.0 upstream port —
USB Speed USB 2.0 Hi-Speed —
Supply Voltage na Operasyon 3 V to 3.6 V —
Operating Current 95 mA —
Packhaging 36-QFN (6 x 6 mm) 36-QFN (6 x 6 mm)
Exposed Pad Present —
Bilang ng Pin 36 pins 36 pins
Uri ng Pagpapasok Surface mount Surface mount
Technology MultiTRAK technology —
Supported USB Device Speeds Low-speed, full-speed, and high-speed —
Port Management 2 downstream ports —
Packaging Tray —
Hanay ng Temperature na Operasyon [DATA_NEEDED: operating temperature range] [DATA_NEEDED: operating temperature range]
Tindminan RoHS [DATA_NEEDED: RoHS status] RoHS compliant
USB Standard — USB 2.0
Supply Voltage Range — 3 V to 3.6 V
Internal Regulator — 3.3 V
Port Power-Switch Control — 3.3 V
ESD Protection — Integrated
Battery-Charging Protocol — BC1.1 protocol support
Hub Technology — MultiTRAK
Lead-Free Status — Lead-free
Maximum USB Data Rate — [DATA_NEEDED: maximum USB data rate]
Crystal or Clock Requirement — [DATA_NEEDED: crystal or clock requirement]
EEPROM Requirement — [DATA_NEEDED: EEPROM requirement]
Programmable Configuration — [DATA_NEEDED: programmable configuration method]
Automotive Qualification — [DATA_NEEDED: AEC-Q100 qualification status]

Mga Datasheets at Resources

Tingnan ang Lahat ng mga Produkto Lumikha ng BOM Hilingin ang Kita