Ano ang nagbago ngayon, kung bakit ito mahalaga para sa iyong BOM, at kung ano ang dapat mong pagsipag-alaran. Bawat katotohanang pagkaklalarawan ay maaaring trace sa pinagmulan nito; ang aming sariling pagsusuri ay nababagong label at inililiban.
Mga maikling balita 89Mga Kategorya 4Pinagsubaybayan na paksa 52RSS foton
Wala nang pangangailangan ng pag-sign in upang basahin ang lahat ng brief, lahat ng pinapahintulang komento, ang pinaka-mas pinagustuhang tugon, mga resulta ng botohan at pinagpili ng tagapagredaktorKailangan ng pag-sign in: magpuna · sumagot · magpuna · bumoto · sundin ang paksa na ito
Pinagmulan ng kalinisan (S1)
Naka hahanap sa huling 24 h354
Malinis na pagsusulat9597
Itayong Agham bago anumang pagtawag ng model1195
Rito sa mababang kalidad na pinagmulan11%
Punta (spes v2.9)
Pumasa145
Hawakan (rehinyo ng tao)648
Itayong Agham240
Tingin ng pinalabas14%
Lahat ng pinalabas
Ngayon / araw na limit5 / 10
Escalasyon ng sensitibong paksa0
Automatikong ililipat sa publikasyonBuwanang walang liwanag
Intel is preparing a Core 2000HX mobile family on 'Raptor Lake Next' dies, reviving DDR4 compatibility for laptops while Nova Lake-HX takes the Core Ultra 4000HX name.
MediaTek and Airoha are showing Filogic 8800, an enterprise-grade tri-band Wi-Fi 8 router platform, claiming near-100% throughput gain and 50% lower system power across mixed Wi-Fi 5/6/7/8 fleets.
Renesas adds four 100V E-mode GaN FETs (RDS(on) 1.2 to 5 milliohm) claiming up to 63 percent lower soft-switching FOM than comparable GaN devices, targeting 800 VDC / 48V power stages for AI servers, humanoid robotics and motor drives.
Rohm is outsourcing TOLL packaging to Tata Electronics and TO-252 packaging to Suchi Semicon, starting with legacy power MOSFETs while keeping wafer fab in-house.
Samsung Electro-Mechanics signs a 290 bln-won MLCC supply deal for AI servers running Jan-Dec 2027, lifting its 2026 long-term contract tally to 3.9 trillion won.
Cervoz adds M.2 2280 NVMe SSDs qualified to MIL-STD-810H vibration, shock, and temperature-altitude tests, aimed at defense and industrial-automation designs.
NVIDIA's supply commitments jumped to $279 billion, mostly for memory, and Morgan Stanley estimates it has reserved 37.3% of 2027 HBM supply - tightening the market for everyone else.
Raspberry Pi raised 2 GB Pi 4 to $67.50 and 2 GB Pi 5 to $77.50 effective October 1, 2026. 1 GB boards and 2 GB Compute Modules are unchanged. Memory tightness is cited as the driver.
tungkol sa impormasyon sa pahina na ito. Ang mga chart sa site na ito ay mga sariling SVG data visualisations na binuo mula sa verifield na data na inililiban sa site na ito; walang mga dekoratibong larawan at walang hot-linked third-party images.
Ambilin ang arawang brief
Isang email sa bawat araw ng pagsusulat. Maaari ka ring idagdag ang XAIPART bilang isang pinagkakatwirang pinanggagalingan sa Google.