Ano ang nagbago ngayon, kung bakit ito mahalaga para sa iyong BOM, at kung ano ang dapat mong pagsipag-alaran. Bawat katotohanang pagkaklalarawan ay maaaring trace sa pinagmulan nito; ang aming sariling pagsusuri ay nababagong label at inililiban.
Mga maikling balita 331Mga Kategorya 4Pinagsubaybayan na paksa 52RSS foton
Wala nang pangangailangan ng pag-sign in upang basahin ang lahat ng brief, lahat ng pinapahintulang komento, ang pinaka-mas pinagustuhang tugon, mga resulta ng botohan at pinagpili ng tagapagredaktorKailangan ng pag-sign in: magpuna · sumagot · magpuna · bumoto · sundin ang paksa na ito
Pinagmulan ng kalinisan (S1)
Naka hahanap sa huling 24 h363
Malinis na pagsusulat9544
Itayong Agham bago anumang pagtawag ng model1183
Rito sa mababang kalidad na pinagmulan11%
Punta (spes v2.9)
Pumasa145
Hawakan (rehinyo ng tao)645
Itayong Agham239
Tingin ng pinalabas14%
Lahat ng pinalabas
Ngayon / araw na limit5 / 10
Escalasyon ng sensitibong paksa0
Automatikong ililipat sa publikasyonBuwanang walang liwanag
Polar Semiconductor licenses imec's GaN-on-Si process and epi to run 8-inch enhancement-mode GaN at its Bloomington, MN power fab, targeting 40-650V with planned expansion for 800V-to-12V data-center conversion.
Lattice Semiconductor and Arm are combining Lattice FPGAs with AMI firmware on Arm AGI CPU server platforms to handle secure boot, management, and OCP-compliant HPM to DC-SCM connectivity via LTPI.
Schneider Electric posted triple-digit data center order growth and lifted its 2026 guidance a second time, with energy management revenue up 18.8% organically to €9.62 billion.
Applied Materials expanded its Besi partnership for hybrid bonding on October 1, while KLA and Lam Research posted divergent FY26 segment growth under tightening export rules.
Good-Ark outlines a five-step defense against fake power diodes, from document and marking checks to X-ray, electrical, and decapsulation verification across the lot.
KLA's advanced-packaging inspection segment is guided to $1.1B in 2026, up over 70% YoY, even as memory component costs pressure margins and tool lead times lengthen.
GF selected as operator for two new 300mm fabs in Malta, NY under a U.S.-Japan initiative. Initial $10B funds a 2029 fab; ~900,000 wafers/year capacity each.
Volvo pairs NVIDIA Hyperion, Halos OS, and the Alpamayo stack for eyes-off driving, but no chip model, launch date, or regulatory path has been disclosed yet.
GE Vernova's Electrification backlog has ballooned to $45B from $6B in 2021, with new Venture Global reservations covering transformers and GIS for up to 21 power islands.
Q4 2026 buyer guide: PTFE resin systems anchor next-generation AI boards while ABF substrate capacity flips from oversupply to a 48–52 week backlog.
·4 min basahin
tungkol sa impormasyon sa pahina na ito. Ang mga chart sa site na ito ay mga sariling SVG data visualisations na binuo mula sa verifield na data na inililiban sa site na ito; walang mga dekoratibong larawan at walang hot-linked third-party images.
Ambilin ang arawang brief
Isang email sa bawat araw ng pagsusulat. Maaari ka ring idagdag ang XAIPART bilang isang pinagkakatwirang pinanggagalingan sa Google.